Skip to content
GGandiv
Start free

Solar and renewable

Solar CRM for rooftop installers and EPC companies

Schedule surveys, quote by kW with a payback estimate and track the subsidy, installation and net-metering until the plant is live. AMC tickets keep customers on your books.

Survey schedulerSurvey photosROI calculatorBOM quoteSubsidy trackerInstall job boardNet-metering statusAMC tickets

Your pipeline, ready on day one

These stages come with the template. Rename, add or remove any of them.

  1. Stage 1LeadA home, society or business asks for a solar quote through an ad, call or referral.
  2. Stage 2Survey scheduledA site survey slot is booked with an engineer.
  3. Stage 3Survey doneRoof area, shading, load and photos are recorded at the site.
  4. Stage 4ProposalA kW proposal with BOM, cost and payback is sent to the customer.
  5. Stage 5AdvanceThe customer pays the advance and the order is confirmed.
  6. Stage 6Subsidy (PM Surya Ghar/DISCOM)The subsidy application and DISCOM approvals are filed and tracked.
  7. Stage 7InstallThe installation team completes the plant against a job card.
  8. Stage 8Net-meteringThe net meter application and inspection are completed with the DISCOM.
  9. Stage 9HandoverThe system is commissioned, the customer is trained and balance is collected.
  10. Stage 10AMCAn annual maintenance contract and service tickets keep the customer active.

What is a solar and renewable CRM?

A solar CRM manages a rooftop project from the first enquiry through survey, proposal, subsidy, installation and net-metering to the annual maintenance contract. In Gandiv, each lead records roof area, monthly bill, sanctioned load, DISCOM and the kW required. Engineers book surveys, upload photos and measurements from the field, and sales sends a proposal with a bill of materials and a payback estimate. The subsidy application, install job and net-metering steps are tracked as stages, and after handover the AMC and service tickets keep the relationship active for cleaning visits and upgrades.

Why solar and renewable teams need one

Problem

Surveys are fixed on a call and the engineer is never sent.

With Gandiv

A survey scheduler assigns an engineer, sends a reminder and records whether it was completed.

Problem

Site photos and measurements stay on personal phones.

With Gandiv

Photos, roof area and shading notes are attached to the lead from the field app.

Problem

Customers cannot judge the payback on a quote.

With Gandiv

The ROI calculator turns bill, kW and tariff into a savings and payback estimate for the proposal.

Problem

Subsidy paperwork sits with different people.

With Gandiv

A subsidy tracker lists each application stage with date, owner and the pending document.

Problem

Installation crews are double-booked.

With Gandiv

A job board shows which crew is on which site and which jobs are waiting for material.

Problem

After handover nobody calls the customer again.

With Gandiv

AMC contracts and service tickets keep cleaning visits and warranty claims on schedule.

Key features

Survey

Survey scheduler with photos

Book a site survey with an engineer, send the customer a reminder and record roof area, shading, load and photos at the site. A completed survey flows straight into the proposal with the measurements attached.

  • Engineer assignment and reminders
  • Roof, shading and load fields
  • Photos attached from the phone

Survey

  • Engineer assignment and reminders
  • Roof, shading and load fields
  • Photos attached from the phone

Proposal

kW proposal with BOM and ROI

Build a quote from panels, inverter, structure and cabling, priced per kW. The ROI calculator shows monthly savings and payback from the customer bill, so the proposal answers the question every buyer actually asks.

  • BOM quote by kW
  • Savings and payback estimate
  • PDF shared on WhatsApp

Proposal

  • BOM quote by kW
  • Savings and payback estimate
  • PDF shared on WhatsApp

Subsidy

Subsidy tracker for PM Surya Ghar and DISCOM

Track each subsidy application with its portal reference, documents submitted, inspection date and approval. Staff see which customers are waiting on paperwork, and customers get status updates without calling you.

  • Application stage and reference
  • Pending document alerts
  • Status update to customer

Subsidy

  • Application stage and reference
  • Pending document alerts
  • Status update to customer

Install

Install job board for crews

Convert a confirmed order into a job card with materials, crew and target date. Crews update progress from the site, and the board shows delays so you can reassign instead of apologising later.

  • Crew and date per job
  • Material checklist
  • Progress updates from site

Install

  • Crew and date per job
  • Material checklist
  • Progress updates from site

Net-metering

Net-metering and handover tracking

Follow the net meter application, DISCOM inspection and meter installation as clear steps with dates. Handover is marked only when the plant is commissioned and the balance payment is received.

  • Application and inspection dates
  • Commissioning checklist
  • Balance payment before handover

Net-metering

  • Application and inspection dates
  • Commissioning checklist
  • Balance payment before handover

AMC

AMC contracts and service tickets

Sell annual maintenance after handover and schedule cleaning and inspection visits. Customers raise a ticket on WhatsApp, and the service team sees warranty, last visit and the next due date.

  • AMC plan and renewal date
  • Visit schedule and tickets
  • Warranty details on the plant

AMC

  • AMC plan and renewal date
  • Visit schedule and tickets
  • Warranty details on the plant

What is inside the template

Everything below is created in your workspace when you pick this template.

Fields

Roof area (sq ft) · Monthly bill (INR) · Sanctioned load (kW) · DISCOM · Required system size (kW) · Roof type · Subsidy opted · Customer type

Automations

Survey reminder - day before and 2 hours before · Proposal follow-up - 2 days after sending · Subsidy document pending nudge · Install day confirmation on WhatsApp · AMC renewal reminder T-30

Reports

Lead to install conversion · Surveys scheduled vs done · Proposals sent vs won by kW · Subsidy applications pending by stage · AMC renewals due

Message templates

Survey confirmation · Proposal with payback · Advance receipt · Subsidy status update · Handover and warranty details

Call script

Ask monthly electricity bill, type of property, roof area and DISCOM. Explain rooftop capacity and the subsidy process in simple terms, and book a free survey slot with the engineer.

By role

Founder or business head

  • Pipeline by stage and kW
  • Subsidy and net-metering delays
  • AMC revenue due

Telecaller or sales

  • Survey booking on the call
  • Proposal and ROI to share
  • Follow-up after proposal

Survey and install teams

  • Survey form with photos
  • Job board and material list
  • Service tickets for AMC

Frequently asked questions

Does Gandiv file subsidy applications?

No. It tracks the status, documents and dates of your applications, while the filing itself is done on the official portal by your team or the customer.

Is the ROI calculation a guarantee?

No. It is an estimate based on the bill, system size and tariff you enter. Present it as indicative and revise it with actual generation data once the plant runs.

Can surveyors work offline at the site?

The field form works on a phone with network access. If connectivity is poor, note the details and upload photos when you are back in coverage.

Can channel partners bring leads?

Yes. Give each partner a source tag and a login that shows only their leads, and track commission against installed projects.

Does it work for commercial and industrial solar?

Yes. Add fields for connected load, tariff category and roof type, and use longer proposal stages for larger projects.

Start with the solar and renewable template

Your pipeline, fields and messages are created for you. Change anything later.

Start free trial
Start free trial